Priyanka Chopra’s Citadel set to be 2nd most expensive show due to cost overruns, reshoots due to creative differences

0

Priyanka Chopra and Richard Madden-starrer Citadel is set to be the second most expensive show ever produced, after The Lord of the Rings: The Rings of Power. Produced by the Russo Brothers and Patrick Moran, the Amazon series has reportedly overrun its already massive budget and may finally cost much above $200 million. Also read: Priyanka Chopra says she’s finally doing roles she wants to after 10 years in Hollywood: ‘I’m still new’

The seven-episode show is a spy thriller and aims to have spinoffs in future, with the spy characters having their own adventures in their native countries, India, Italy and Mexico.

According to The Hollywood Reporter, multiple sources have claimed that differences in vision led to the exit of half the creative team and forced the show into a round of expensive reshoots. The sources have said that the web series that was already costing at least $160 million net has an additional cost of $75 million attached to it, which would make it the second-most expensive show ever made.

The report further quotes sources which said that Amazon had reservations about early footage, with the Russo Brothers, who were busier with their other project, The Gray Man, and made a late entry. This led to “creative differences” and two competing cuts, one pushed by the Russos, the other by Appelbaum and Nemec. Soon there were two sides – Joe Russo and Appelbaum, who was the series showrunner. Appelbaum, along with Brian Kirk, who directed five out of seven episodes and line producer Sarah Bradshaw made an exit leading to expensive reshoots.

Priyanka was filming throughout 2021 and even earlier this year before finally wrapping up the shoot. She had shared regular updates from the sets, along with her look – injuries on her face and body. Citadel marks Priyanka’s debut OTT project. She made it big on the global platform with her hit TV series, Quantico.

Stay connected with us on social media platform for instant update click here to join our  Twitter, & Facebook

We are now on Telegram. Click here to join our channel (@TechiUpdate) and stay updated with the latest Technology headlines.

For all the latest Web-Series News Click Here 

Read original article here

Denial of responsibility! Rapidtelecast.com is an automatic aggregator around the global media. All the content are available free on Internet. We have just arranged it in one platform for educational purpose only. In each content, the hyperlink to the primary source is specified. All trademarks belong to their rightful owners, all materials to their authors. If you are the owner of the content and do not want us to publish your materials on our website, please contact us by email – [email protected]. The content will be deleted within 24 hours.
Leave a comment